Presidency
Of The Republic |
|
 |
 |
 |

 |  |




 |
 |
 |
 |
Millions of Euros |
|
|
|
 |
|
|
|
|
|
|
|
 |
TITLE
OF THE PROJECT
|
TOTAL
COST
|
BUDGETARY
INSCRIPTION 2004
|
COMMENTARY
|
|
|
|
 |
AIRPORT OF OLLOMBO |
67,5 |
6 |
Building
an airport of bursting, release and opening-up in the northern part
of the country.
|
 |
|
|
 |
AIRPORT OF BRAZZAVILLE |
50 |
3 |
Its
realization will equip the country with a modern window and will improve
safety conditions.
|
 |
|
|
 |
AIRPORT OF POINTE-NOIRE |
20 |
6,5 |
It
will allow to reset the airport of Point-Noire to the international
aeronautical standards.
|
 |
|
|
 |
AIRPORT OF OUESSO |
1,8 |
0,6 |
This
construction is registered with the aim of improve the passengers
travel’s conditions.
|
 |
|
|
 |
AIRPORT OF IMPFONDO |
10 |
2 |
Handing-over
to the standards of the track to allow the landing.
|
 |
|
|
 |
CONSTRUCTION AND EXTENSION
OF THE PORT OF OYO |
8 |
- |
This
extension, will allow the level of services in relation to the airport
of Ollombo and the RN2.
|
|
|
|
 |
CONSTRUCTION OF THE
PORT OF LEKETY |
9 |
3 |
Construction
of a Port supporting the transit of the traffic between Congo and
Gabon.
|
 |
|
|
|
REFITTING AND MODERNIZATION
OF THE BEACH OF BRAZZAVILLE |
5 |
0,4 |
Its
installation makes it possible to improve the window of the country
when entering through the river.
|
|
|
|
|
CONSTRUCTION OF TWO
RAIL STATIONS IN BRAZZAVILLE |
10 |
PM |
Improvement
of traffic conditions when entering to and departing from Brazzaville.
|
|
|
|
|
CONSTRUCTION OF TWO
RAIL STATIONS IN POINTE-NOIRE |
6 |
- |
|
|
|
|
|
|
|
|
|
|
|

|
Equipment
and Civil Engineerings |
|
 |
 |
 |

 |  |
 |
 |
Millions of Euros |
|
|
|
 |
|
|
|
|
|
|
|
 |
TITLE
OF THE PROJECT
|
TOTAL
COST
|
BUDGETARY
INSCRIPTION 2004
|
COMMENTARY
|
|
|
|
 |
POINTE-NOIRE - DOLISIE
TOWARDS BZV |
202,5 |
1 |
This
is to allow the disengagement of the railway and improve the road
Point-Noire/Brazzaville.
|
 |
|
|
 |
OWANDO - OUESSO |
122,5 |
0,7 |
The
goal is to improve this part of the country and to allow the trading
exchange with the RCA and Cameroon by terrestrial way.
|
 |
|
|
 |
OBOUYA - OKOYO |
45,5 |
- |
|
 |
|
|
 |
OKOYO - FRONTIERE
GABON |
33,9 |
6,720 |
To
allow connection the transafricaine and facilitate the exchanges with
Gabon.
|
 |
|
|
 |
BOUANSA - MOUYONDZI - MOUKOUKOULOU |
19 |
4 |
Opening-up
of Mouyondzi and its surroundings by allowing their access to the
railroad, the RN1 and the hydroelectric power station.
|
 |
|
|
 |
OBOUYA - OWANDO |
30 |
10,5 |
Rehabilitation
of the section for a continuity of the traffic on the RN2 (from Brazzaville
to Ouesso).
|
|
|
|
 |
SIBITI - ZANAGA |
32,5 |
- |
|
 |
|
|
|
BZV - KINKALA - MATOUMBOU |
35 |
- |
|
|
|
|
|
NGO - NGOULONKILA |
20 |
- |
|
|
|
|
|
ETSOUALI - OBOUYA |
27,5 |
6 |
|
|
|
|
|
OBOUYA - BOUNDJI |
45,5 |
3 |
To
allow connection the transafricaine and facilitate the exchanges with
Gabon.
|
|
|
|
|
BRAZZAVILLE – KINKALA –
MATOUMBOU |
|
|
Financing
FED. Construction of the road to allow the opening-up of the department
of Pool. Section RN1
|
|
|
|
|
NGO - NGOULONKILA |
|
|
Built
in 1985, this road is in a state of degradation. The challenge is to
restore the serviceability
|
|
|
|
|
ETSOUALI – OBOUYA |
|
|
Built
in 1985, this road is in a state of degradation. The challenge is to
restore the serviceability
|
|
|
|
|
BRIDGE OVER MVOUMA |
|
|
To ensure
the fluidity of the traffic and to avoid any load breaking |
|
|
|
|
|
|
|
|
|
|

|
Administration
of Territory |
|
 |
 |
 |

 |  |
 |
 |
Millions of Euros |
|
|
|
 |
|
|
|
|
|
|
|
 |
TITLE
OF THE PROJECT
|
TOTAL
COST
|
BUDGETARY
INSCRIPTION 2004
|
COMMENTARY
|
|
|
|
 |
RAVINE DE MIMI |
1,8 |
0,9 |
Work
to be continued, advances starting granted.
|
 |
|
|
 |
GARBAGE DUMPS OF BRAZZAVILLE |
28 |
4 |
Works
in progress for the improvement of moving over the urban network.
|
 |
|
|
 |
AVENUE OF THE OUA |
4,8 |
- |
Contract
of studies in process of signature for the improvement of moving over
the urban network.
|
 |
|
|
 |
GARBAGE DUMPS OF POINTE-NOIRE |
8 |
- |
Improvement
of moving over the urban network |
 |
|
|
 |
SIDEBOARD WAY OF POINTE NOIRE'S AIRPORT |
12 |
- |
Studies
in progress, improvement of accessibility to the airport |
 |
|
|
 |
GARBAGE DUMPS OF DOLISIE |
5,3 |
0,3 |
Improvement
of the serviceability of the urban roadway systems of Dolisie
|
|
|
|
 |
2e NORTH EXIT OF BRAZZAVILLE |
|
|
Signed
contract, in waiting of financing, for a study to relieve congestion
the current exit while disenclosing the north-eastern districts of
the city |
 |
|
|
|
REHABILITATION OF
THE HEADQUARTER OF THE DEPARTMENT OF LEKOUMOU |
0,6 |
- |
Improvement
of the working conditions of the decentralized services |
|
|
|
|
COMPLETION OF THE LOCAL OF LIKOUALA |
2 |
- |
Improvement
of the working conditions of the decentralized services |
|
|
|
|
CENTRAL MARKET OF
OYO |
3 |
- |
|
|
|
|
|
CONSTRUCTION OF DEPARTEMENTAL
HEADQUARTERS |
40 |
- |
Improvement
of the working conditions of the decentralized services |
|
|
|
|
CONSTRUCTION OF DEPARTEMENTAL
RESIDENCES |
20 |
- |
|
|
|
|
|
ORGANIZATION OF THE
BANKS OF MOSSAKA |
3,2 |
- |
Construction
of a regional market which will integrate the port activity |
|
|
|
|
ORGANIZATION OF THE
LAGOON TICIKOBO |
4,6 |
- |
Development
of a marshy zone for the realization of a real estate operation |
|
|
|
|
|
|
|
|
|
|






|
Post
& Telecommunications |
|
 |
 |
 |

 |
 |
Millions of Euros |
|
|
|
 |
|
|
|
|
|
|
|
 |
TITLE
OF THE PROJECT
|
TOTAL
COST
|
BUDGETARY
INSCRIPTION 2004
|
COMMENTARY
|
|
|
|
 |
PROJECT OF NATIONAL
COVERAGE IN TELECOMMUNICATION (25 000 000 USD) |
25,9 |
9,1 |
Telecommunications
national coverage |
 |
|
|
 |
 |
 |
 |
|
 |
|

|
Mines,
Energy and Hydraulics |
|
 |
 |
 |

 |
 |
Millions of Euros |
|
|
|
 |
|
|
|
|
|
|
|
 |
TITLE
OF THE PROJECT
|
TOTAL
COST
|
BUDGETARY
INSCRIPTION 2004
|
COMMENTARY
|
|
|
|
 |
CONSTRUCTION OF THE
POWER STATION IMBOULOU |
282 |
0,6 |
Must
ensure of the good completion of the work.. |
 |
|
|
 |
 |
 |
 |
|
 |
|

.../...
.../...
 |
 |
Millions of Euros |
|
|
|
 |
|
|
|
|
|
|
|
 |
TITLE
OF THE PROJECT
|
TOTAL
COST
|
BUDGETARY
INSCRIPTION 2004
|
COMMENTARY
|
|
|
|
 |
ENGINEERING CONSULTANT IMBOULOU POWER
PLANT |
13,7 |
2,6 |
To
assist the building owner in the control and the decision-making related
to the good execution of work.
|
 |
|
|
 |
THERMAL POWER STATION
OF BZV |
38,1 |
PM |
Transport
of energy produced at IMBOULOU and its interconnection to the existing
network. |
 |
|
|
|
REHABILITATION OF MINDOULI POST |
7,6 |
3,8 |
Re-establishment
of the national and international interconnection network of the power
stations of MOKOUKOULOU, INGA and DJOUE |
|
|
|
|
CENTRAL OF OUESSO |
0,7 |
0,7 |
Electrification
of certain localities of the departments of the SANGHA and improvement
of the conditions of operating of the centres. |
|
|
|
|
STUDIES AND CONSTRUCTION OF ENERGY LINES
OF TRANSPORT |
121 |
0,7 |
|
|
|
|
|
REHABILITATION OF
POWER PLANTS AND NETWORKS IN ADMINISTRATIVE CENTER OF DEPARTMENTS |
2,3 |
0,3 |
80%
paid to the suppliers and materials deposited on the sites. |
|
|
|
|
DRINKING WATER IN COUNTRY TOWN |
1,4 |
0,4 |
Improvement
of the drinking water service road of the population |
|
|
|
|
DRINKING WATER IN
CITIES |
6 |
3 |
Work
in progress. |
|
|
|
|
CENTRAL CONSTRUCTION OF KOMO |
76,2 |
PM |
Electricity
supply of the airport of Ollombo and its surroundings |
|
|
|
|
|
|
|
|
|
|

|
Culture,
Arts and Tourism |
|
 |
 |
 |

 |
 |
Millions of Euros |
|
|
|
 |
|
|
|
|
|
|
|
 |
TITLE
OF THE PROJECT
|
TOTAL
COST
|
BUDGETARY
INSCRIPTION 2004
|
COMMENTARY
|
|
|
|
 |
CONSTRUCTION OF A 250 PLACES HOTEL
|
6,8 |
1,5 |
Integrated
project allowing the exploitation to ICAO standards of the airport
of Ollombo. Increase of the reception capacity of the locality
|
 |
|
|
 |
CONSTRUCTION OF A
CULTURAL CITY |
30,5 |
4,6 |
Creation
of a framework suitable with the organization of the cultural events. |
 |
|
|
|
|
|
|
|
|
|


 |
 |
Millions of Euros |
|
|
|
 |
|
|
|
|
|
|
|
 |
TITLE
OF THE PROJECT
|
TOTAL
COST
|
BUDGETARY
INSCRIPTION 2004
|
COMMENTARY
|
|
|
|
 |
REHABILITATION OF THE HOSPITAL OF DOLISIE |
6,9 |
1,8 |
Work
in progress, the equipment will be acquired asgifts |
 |
|
|
 |
REHABILITATION AND
EQUIPEMENT CHU |
7,6 |
3,8 |
Improvement
of hygiene and care conditions |
 |
|
|
|
CONSTRUCTION OF THE HOSPITAL OF OYO |
8,8 |
1,2 |
Improvement
of hygiene and care conditions |
|
|
|
|
REHABILITATION OF
THE HOSPITAL BLANCHE GOMEZ |
7,6 |
1,2 |
Increase
of the reception capacity |
|
|
|
|
CONSTRUCTION OF FLATS AND VRD OF THE
HOSPITAL OF LOANDJILI A POINTE-NOIRE |
1,5 |
0,6 |
Housing
of the working people and cleansing of the environment of the hospital |
|
|
|
|
|
|
|
|
|
|


 |
 |
Millions of Euros |
|
|
|
 |
|
|
|
|
|
|
|
 |
TITLE
OF THE PROJECT
|
TOTAL
COST
|
BUDGETARY
INSCRIPTION 2004
|
COMMENTARY
|
|
|
|
 |
CONSTRUCTION OF A STADIUM ANNEXE IN
BRAZZAVILLE |
1,3 |
1,3 |
- |
 |
|
|
 |
AMENAGEMENTOF THE
MASSAMBA DEBAT STADIUM |
1,6 |
1,6 |
- |
 |
|
|
|
EQUIPMENTS OF THE MASSAMBA DEBAT STADIUM |
4,6 |
4,6 |
- |
|
|
|
|
|
|
|
|
|
|


|
|